A.Software support B.Hardware isolation C.Static changes in partitions D.Micro-Partitioning
A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()
A.Update Siebel to include the study results. B.Review the study results and LPAR worksheet with the customer. C.Design detailed system configurations around the study results. D.Work with the client executive and the brand manager to establish discounts.
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()
A.The p655 supports only two LPARs. B.The p655 supports only four LPARs. C.There are not enough available slots for three LPARs. D.There are not enough available slots for four LPARs.